PROJECT


Fridge Air Conditioning


In the automatic state, the operator puts the double-ribbed shoe into the mold as required, puts the casing and positioning block into the designated position, presses the start button, rotates the pressing cylinder to press the shoe, the positioning rod on one side of the casing extends out, and presses the start button again.